OFFICE BUILDING PROJECT-Colgate Palmolive

D&B Building Solutions replaced outdated chillers with new higher-efficiency, magnetic bearing units. The chilled water distribution system was retrofitted to include an air separation unit and a new chilled water pumping system equipped with variable frequency drives generating over $300,000 in cost avoidance savings.

Read More

Posted in